All your rooms in one account.
One controller per room, every room in one account, with roles that decide who can change what. We would rather show you what is tested and what is not than have you find out in due diligence.
What a facility can rely on today, and what it cannot.
The same table we would want to see before trusting a new system with a licensed crop.
| Area | Status | Detail |
|---|---|---|
| User roles | Working | Owner, admin, operator, viewer. Enforced server-side. Automated tests confirm one customer can never read another's rooms. |
| Multiple rooms in one account | Working | Switch between rooms. A single overview of all rooms is planned. |
| Inviting team members into your account | Planned | Roles exist and are enforced; the invitation flow is not built yet. |
| Control command record | In development | Each command is stored with user, time and outcome. Viewing and export are planned. |
| Setting-change history | Planned | |
| Per-pump fault isolation | In development | Each pump has its own controller, so one failure does not stop the others. |
| Data hosting | Working | EU region. Encrypted nightly backups. Sensor history kept 90 days by default. Single server, no failover yet. |
| Signed, staged firmware updates | Working | Gateway only. Controller and pump updates currently need a programming probe. |
| Offline operation | Planned | Scheduled switching currently depends on the cloud. |
| Case rating, CE/UKCA or FCC | Planned | The cases in the pictures are planned designs; none is built or rated yet, and nothing is certified. |
Regulatory fit. GrowRoom has not been assessed against GMP, GACP or similar record-keeping standards. It has no electronic signatures or validation package. We do not claim compliance; we can describe the features and let your quality team judge.
Prototype units in one room, with a direct line to the engineer.
A small number of facilities run prototype units, give structured feedback and help decide the roadmap. It suits teams willing to work with prototype-stage hardware.
- 01
Tell us about the room
Room count, growing system and equipment, on the early-access form.
- 02
A technical call
We go through your room and the status page together, with supporting documents under NDA.
- 03
Agree the terms
Terms, pricing and unit numbers are confirmed in writing before anything is shipped or charged.